Do you need a demolition permit in Charlotte, NC?

Yes. In Mecklenburg County, tearing down a house or a commercial building takes a demolition permit from Mecklenburg County Code Enforcement. The property owner or the owner’s agent gets it. The fee is paid to Code Enforcement when the permit is issued.

In Union County, the county’s Building Code Enforcement office issues building permits everywhere but Monroe and Waxhaw. Those two run their own. The county’s fee schedule, effective August 1, 2026, lists a $100 demolition permit, residential or commercial. Start the paperwork before house demolition goes on the calendar, since asbestos rules and the 811 notice can come first.

Who issues a demolition permit in Charlotte and Union County?

The address decides the office. Check which county and which town the lot sits in before you apply.

Where the building isWho issues the permitWhat the office lists for a demolition
Charlotte and the Mecklenburg County townsMecklenburg County Code Enforcement; start with its Customer Information and Resource Center (CIRC)A residential demolition checklist and cover sheet, a City of Charlotte zoning supplemental for a home in Charlotte, a Health Department demolition/move-off application, the Mecklenburg County Air Quality asbestos (NESHAP) form
Union County outside Monroe and WaxhawUnion County Building Code EnforcementA $100 demolition permit, residential or commercial, on the fee schedule effective August 1, 2026
MonroeCity of MonroeA demolition permit application for the entire structure, a site plan and the city’s asbestos removal brochure
WaxhawTown of Waxhaw Building Inspections and PermittingThe town issues its own building permits, so ask it what a demolition file needs

Mecklenburg County Code Enforcement is part of the county’s Land Use and Environmental Services Agency (LUESA). Its rule covers removing or demolishing any building at one- and two-family homes and townhomes. Commercial work needs a permit too.

The county says permits are paid for by the general contractor. A homeowner acting as his or her own general contractor pays instead.

Union County Building Code Enforcement covers unincorporated land and the county’s other towns, Indian Trail and Weddington among them. Inside Monroe or Waxhaw, the city or the town issues the permit.

This guide covers the North Carolina side. For a teardown in York County, South Carolina, check with the county or the town that covers the address.

Do you need an asbestos inspection before demolition?

The state recommends one on every demolition, single-family homes included. That advice comes from the state’s Health Hazards Control Unit (HHCU). The inspection must be done by an NC-accredited asbestos inspector.

That inspection, and any asbestos removal it leads to, is a separate job from ours. The owner or the builder sets it up before we bring the machines.

A federal rule covers commercial and industrial buildings, plus residential buildings with more than 4 dwelling units. The owner must have them inspected for asbestos before demolition. A demolition notification then goes in at least 10 working days before the work starts. It is required even if no asbestos is found.

A house can fall under the notice too. The state’s brochure names residences demolished for commercial or industrial expansion.

Where does the notice go? The HHCU runs the program in all but three North Carolina counties, Union County included. Mecklenburg County runs its own program through Mecklenburg County Air Quality (MCAQ). There, a demolition notification goes in with an asbestos inspection report, 10 working days before the work starts.

MCAQ’s notice covers industrial, commercial, business, school and church buildings, “and even private residences in certain circumstances.” If you own a house in Mecklenburg County, check with MCAQ before you set a date.

The permit and the asbestos notice are separate filings. The state’s brochure says a local demolition permit does not satisfy the HHCU notification. That notice comes in addition to any permit a town, city or county issues.

What else has to happen before a house comes down?

Notify NC811. North Carolina law has the person responsible for a demolition notify NC811 before it starts. The notice is due no less than three full working days ahead. The law exempts an owner working on his or her own single-family lot, clear of any utility right-of-way or easement.

Get the utilities disconnected. The utility companies shut off and disconnect power, gas and water before the building comes down. The owner schedules each one.

Plan for any well or septic system on the lot. In Mecklenburg County, the demolition packet includes a Health Department demolition/move-off application for that side of the job.

Ask about erosion control. Mecklenburg County’s demolition page says to contact City of Charlotte Soil Erosion and Sediment Control in two cases. One is a project that will disturb more than one acre. The other is a property within a SWIM buffer.

Under state law, disturbing more than one acre takes an approved erosion and sedimentation control plan. The plan is filed 30 or more days before the work starts. When a job calls for it, we put in erosion control such as silt fence.

Check for a historic district. A local landmark, or a building in a local historic district, needs a certificate of appropriateness to come down. State law says that certificate generally cannot be denied. Its effective date can be delayed up to 365 days from approval, though.

How much does a demolition permit cost?

Union County Building Code Enforcement’s fee schedule, effective August 1, 2026, lists a demolition permit at $100, residential or commercial. Starting work without a permit costs a double permit fee.

In Mecklenburg County, demolition fees are paid to Code Enforcement when the permit is issued. Ask CIRC for the amount on your building. In Monroe or Waxhaw, ask the city or the town for its fee.

The permit fee covers the permit only. The asbestos inspection and the teardown itself are separate costs.

What happens to the debris after a teardown?

Cornerstone Excavation Group loads the debris as the structure comes down. The slab, footings and old foundation come out next, as concrete removal. The debris leaves on our dump trucks through our material hauling work.

NC DEQ lists unpainted concrete as inert debris, along with brick, concrete block, uncontaminated soil, rock and gravel. Ask where each kind of debris goes when you compare bids. For slab and driveway price ranges, see our concrete removal cost guide.

In Clover, South Carolina, we took down a fire-damaged structure that had been left abandoned. The concrete foundation remnants came out of the ground and everything was hauled off. The site was left cleared.

Who pulls the permit, and how does Cornerstone help?

Demolition permits are typically pulled by the property owner or the general contractor. Mecklenburg County’s rules point the same way. After an on-site look at the building, we can tell you what the job is likely to need.

Once the permit and the utility disconnects are done, residential demolition typically takes 1 to 3 days. Weather and access move the schedule.

Cornerstone is based in Indian Trail, on the east side of Charlotte, and 5.0-rated on Google. The estimate is free. Call (980) 315-5707, or see how our demolition service in Indian Trail and the Charlotte metro works.

Frequently asked questions

Do I need a permit to demolish a house in Charlotte?
Yes. Mecklenburg County Code Enforcement requires a permit to remove or demolish any building at one- and two-family homes and townhomes. The property owner or the owner's agent gets it, and the fee is paid when the permit is issued. Asbestos and 811 rules can apply on top of the permit.
How do you get a demolition permit in Mecklenburg County?
Start with Code Enforcement's Customer Information and Resource Center (CIRC), which helps with residential and commercial demolition permits. The forms include a residential demolition checklist and cover sheet, plus a City of Charlotte zoning supplemental. There is also a Health Department demolition/move-off application and the Air Quality asbestos form. A demolition notification to Air Quality goes in with an asbestos inspection report.
How much does a demolition permit cost?
Union County Building Code Enforcement's fee schedule, effective August 1, 2026, lists $100 for a residential or commercial demolition permit. Starting work without a permit costs a double permit fee. In Mecklenburg County, fees are paid to Code Enforcement when the permit is issued, so ask CIRC for the amount. Monroe and Waxhaw issue their own permits, so ask the city or the town.
Do you need an asbestos survey before demolition?
North Carolina's Health Hazards Control Unit recommends an asbestos inspection on every demolition, single-family homes included. An NC-accredited asbestos inspector has to do it. The federal rule requires it for commercial and industrial buildings and residential buildings with more than 4 dwelling units. Those need a notification at least 10 working days ahead, even when no asbestos is found.
Does a demolition permit cover the asbestos notification?
No. The state's brochure says a local demolition permit does not satisfy the HHCU notification. In Union County, any required notice goes to the state's Health Hazards Control Unit. In Mecklenburg County it goes to Mecklenburg County Air Quality, whose rule can reach private residences in certain circumstances.
Do you have to call 811 before demolition in North Carolina?
Yes, unless you own the single-family lot and do the work yourself, clear of any utility right-of-way or easement. State law has the person responsible for a demolition notify NC811 before it starts. The notice is due no less than three full working days ahead.
Does Cornerstone Excavation Group pull the demolition permit?
No, demolition permits are typically pulled by the property owner or the general contractor. After an on-site look at the building, we can tell you what the job is likely to need. Call (980) 315-5707 for a free estimate.
Free Estimates

Get In Touch With Cornerstone Excavation Group

Tell us about the job on the form, or call (980) 315-5707. We will get back to you and set up a free look at the site.

  • (980) 315-5707
  • Indian Trail, NC · serving the Charlotte metro, Union County and the York County side of South Carolina
  • Free estimates · land clearing, grading, site prep, utility lines and demolition

Get a Free Quote

Tell us about the job. We will get right back to you.

Call (980) 315-5707